Experience • Engineering

460 Projects Completed
Engineering • Drainage/Flood Control
We work closely with our clients to solve a variety of drainage and flood control issues for a wide range of projects. We understand that proper drainage is a critical aspect in the design of most civil engineering projects; we know that meeting local and federal regulations is vital to a project’s success. Through our work, we support safe and sustainable development for clients specifically and for the community at large.
-
Meadow Valley Wash Hydrologic, Hydraulic, and Sedimentation Analysis
View Project -
Springdale Storm Water Master Plan
View Project -
Santa Clara Tuacahn Wash Flood Retarding Structure
View Project -
Kanab Flood Retarding Structure
View Project -
Higley Road and Southern Avenue Drainage Analysis
View Project -
City of Caliente Spring Heights Flood Control Improvements
View Project -
Star Valley Ranch Drainage Master Plan
View Project -
Sky Wash Flood Retarding Structure DCR
View Project -
Avondale City Center Master Drainage Plan Update
View Project -
Magma Flood Retarding Structure – Dam Break Analysis
View Project -
Dynamite Pre-cast Bridge Design and Wash Study
View Project -
Cactus Flower Drainage Trench Drains
View Project -
27th Avenue Landfill Drainage
View Project -
Frontier Coker Paving and Drainage Project
View Project -
Fillmore Center Street Flood Channel
View Project -
Van Buren Street Drainage Design Concept Report Phase 1
View Project