Willard Perry Wastewater Collection, Force Main, and Lift Station

  • Client Willard City

  • Location Willard, Utah

  • Services Feasibility Study, Funding, Installation

Project Highlights

  • Conducted a feasibility study and procured funding for the installation of a brand-new sewer system to replace residents’ current septic systems.

  • Installed 165,000 feet of sewer mainline with lateral design and construction, 20,000 feet of gravity sewer collection system, and 9,400 feet of force main.

  • Installed tri-plex lift station and 3-phase underground power from Highway 89 to the lift station.