Willard Perry Wastewater Collection, Force Main, and Lift Station
-
Client Willard City
-
Location Willard, Utah
-
Services Feasibility Study, Funding, Installation
Project Highlights
-
Conducted a feasibility study and procured funding for the installation of a brand-new sewer system to replace residents’ current septic systems.
-
Installed 165,000 feet of sewer mainline with lateral design and construction, 20,000 feet of gravity sewer collection system, and 9,400 feet of force main.
-
Installed tri-plex lift station and 3-phase underground power from Highway 89 to the lift station.