Experience • Industrial and Mining
West Elk Mine Slope Stability Analysis
-
Client Mountain Coal Company
-
Location Somerset California
-
Services Slope stability on refuse pile, new access road construction
Project Highlights
-
Analysis included obtaining representative soil samples from the field for laboratory analysis
-
Modeled the stability of the existing refuse pile
-
Used SLOPE/ W analysis of the hillside
-
Confirmed that the refuse pile was being stably constructed
-
In accordance with Colorado Mined Land Reclamation Board
-
Permitted, designed and supervised construction of 1.3-mile long access road
-
Conducted a hydrologic/ hydraulic analysis for roadway drainage
-
Geotechnical investigation/slope stability analysis
-
Roadway design
-
Drainage design to meet requirements of USFS and the State of Colorado
-
Performed construction administration and observation