Experience • Engineering

University Drive Arterial Reconstruction

  • Client City of Mesa

  • Location Mesa, Arizona

  • Services Arterial Reconstruction

Project Highlights

  • Designed new right turn lanes, street lighting and water mains.

  • Prepared roadway reconstruction documents for 6+ miles of arterial streets.

  • Designed project within 90 consecutive working days to qualify for funding from the American Recovery and Reinvestment Act of 2009 (ARRA).

  • Removed existing pavement down to the subgrade as required.

  • Upgraded all sidewalk ramps and added sidewalk to several sections to meet current ADA standards.

  • Completed 24,800 feet of roadway & striping.