Experience • Wastewater

Provo Westside Lift Station Rehabilitation

  • Client City of Provo

  • Location Provo, Utah

  • Services Evaluation and Improvements

Project Highlights

  • Designed improvements to the lift station

  • Addressed the most pressing needs

  • Recommended adding a third pump to the duplex pump station

  • Third pump was smaller than the existing pumps

  • Smaller pump was selected to eliminate short cycling and add a level of redundancy

  • Design utilized the existing controls building, wetwell, and valve vault but added the third pump, a new control panel, and an additional valve vault