Experience • Engineering

Ogden City Culinary Water Treatment Plant

  • Client Ogden City

  • Location Ogden, UT

  • Services Study, equipment selection, design, bidding, and construction administration

Project Highlights

  • New water treatment plant

  • New membrane plant capable of year-round operation replaced existing seasonal treatment system

  • Plant operates at up to 13.5 MG per day, with planned expansion to 17 MG per day

  • Benefits include reduced operating costs on a long-term basis and a more flexible operation schedule

  • 99.9% of processing water is reused, nearly eliminating all waste

  • Existing plant remained operational during construction, then demolished along with sludge drying beds