Manila Wastewater Improvements Project
-
Client Town of Manila
-
Location Manila, Utah
-
Services Funding Acquisition, Design Engineering, Survey, GIS, Construction Management and Observation
Project Highlights
-
Investigated condition of existing system to determine locations that could be lined and locations that needed full replacement
-
5,500 feet of sewer pipe was replaced
-
54 laterals were reconnected to the new sewer mains
-
25 new manholes were installed
-
20 existing manholes were replaced
-
10,000 feet of existing sewer pipe was lined
-
60 laterals were reconnected to the new lining
-
The original project was constructed under budget
-
Remaining budget was used to install a new meter and screen structure at the lagoons, as well as pipework and control structures for two lagoon cell bypasses