Experience • Water

Kanarraville Culinary Water Improvements Project

  • Client Kanarraville Town

  • Location Kanarraville, Utah

  • Services Design, Survey, Construction Drawings, Bidding and Negotiating, Construction Administration, Construction Observation

Project Highlights

  • Redevelop spring as culinary water source.

  • Drinking water rule compliance.

  • Environmental sensitivity.

  • SITLA right-of-way.

  • Winter construction.

  • Disinfection.

  • Micro-particulate analysis.

  • New culinary water well.

  • Pump control building.

  • Approximately 3,000 feet of culinary water transmission line.

  • Reconfiguration of existing chlorination facilities.

  • Redevelopment of Kanarraville Spring.

  • Work at the spring quadrupled the amount of water being captured and introduced into the culinary water system.

  • The spring development process eliminated deep-rooted vegetation that had fouled the earlier collection works and captured water being lost on the site.