Experience • Wastewater

Fiesta Tech Lift Station and Force Main

  • Client Town of Gilbert

  • Location Gilbert, AZ

  • Services Planning, design, permitting

Project Highlights

  • Reconfiguration of the sewer service in the Fiesta Tech area so the Town of Gilbert could provide service

  • Required disconnection from City of Mesa's service, reconfiguration of 2,000 feet of gravity sewer, design of a new lift station and force main.

  • Lift station is approximately 25 feet deep and capable of pumping 370 gallons per minute

  • Required railroad crossing and coordination with multiple utilities