Project Highlights

  • Transmission line to connect Well #11 (2,500 gmp production) to an existing 1.5 MG above-ground steel reservoir

  • Conversion of 4,000 feet of 12" and 5,000 feet of 16" ACP distribution mains into a chlorinated well water transmission pipeline

  • Addition of new 6" DIP and service/hydrant connections were required for replacement of 12" and 16" lines