Experience • Electrical

CCWC Well #11 Equipping Electrical Design

  • Client EPCOR Water

  • Location Phoenix, Arizona

  • Services Survey, Design, Permitting, Bidding, Construction Administration, Construction Observation, Record Drawings, Engineer of Record

Project Highlights

  • Electrical design included the replacement of the existing utility service with a new 800 Amp service to the site, automatic transfer switch with generator connection provisions, well pump controls, SCADA system panel, and site power to include well pump building and chlorination building.

  • This project also included tank modifications for the addition of chlorination monitoring equipment.