Experience • Water
Bear River JPB Water Improvements
-
Client Bear River Regional Joint Powers Board
-
Location Bear River, Wyoming
-
Services Study, Funding, Planning, Design, Bidding, Modeling, Permitting, Project Administration
Project Highlights
-
23 miles of new 16” to 6” distribution pipeline.
-
400 service connections.
-
75 hp booster pump station.
-
Interconnect station.
-
Various control valves including two way PRVs and a flow control valve.
-
Three crossings of the Bear River, accomplished with open cut methods including one crossing entirely in bedrock requiring channeling of the river.
-
Crossing of the Union Pacific Railroad’s mainline at Evanston.