Experience • Water

Bear River JPB Water Improvements

  • Client Bear River Regional Joint Powers Board

  • Location Bear River, Wyoming

  • Services Study, Funding, Planning, Design, Bidding, Modeling, Permitting, Project Administration

Project Highlights

  • 23 miles of new 16” to 6” distribution pipeline.

  • 400 service connections.

  • 75 hp booster pump station.

  • Interconnect station.

  • Various control valves including two way PRVs and a flow control valve.

  • Three crossings of the Bear River, accomplished with open cut methods including one crossing entirely in bedrock requiring channeling of the river.

  • Crossing of the Union Pacific Railroad’s mainline at Evanston.