Project Highlights

  • Completed a hydroelectric facility in an existing historical structure that was abandoned during the 1960’s. The project was split into upper- and lower-units including dam rehabilitation, penstock replacement for production of electricity, and powerhouse refurbishment with all new equipment. Upper unit included 7,000 feet of 43-inch and lower included 1,800 feet of 48-inch steel penstock.

  • Coordinated facility start-up and development of operations and maintenance program.

  • Installed 900 kW and 700 kW generators.