Experience • Engineering
Chaparrel Well #11 Improvements and Transmission Main
- 
								Client EPCOR Water 
- 
								Location Fountain Hills, AZ 
- 
								Services Water transmission line design, survey, permitting, and construction administration 
Project Highlights
- 
								Transmission line to connect Well #11 (2,500 gmp production) to an existing 1.5 MG above-ground steel reservoir 
- 
								Conversion of 4,000 feet of 12" and 5,000 feet of 16" ACP distribution mains into a chlorinated well water transmission pipeline 
- 
								Addition of new 6" DIP and service/hydrant connections were required for replacement of 12" and 16" lines 
 
						 
						