Experience • Engineering
Chaparrel Well #11 Improvements and Transmission Main
-
Client EPCOR Water
-
Location Fountain Hills, AZ
-
Services Water transmission line design, survey, permitting, and construction administration
Project Highlights
-
Transmission line to connect Well #11 (2,500 gmp production) to an existing 1.5 MG above-ground steel reservoir
-
Conversion of 4,000 feet of 12" and 5,000 feet of 16" ACP distribution mains into a chlorinated well water transmission pipeline
-
Addition of new 6" DIP and service/hydrant connections were required for replacement of 12" and 16" lines