C.C. Cragin Water Treatment Plant & Tailrace Connection

  • Client Town of Payson

  • Location Payson, Arizona

  • Services Membrane Water Treatment Plant, Water Storage, Hydroelectric Facility, Reuse Water Lift Station, Sludge Handling

Project Highlights

  • Designed 4.5 MGD capacity membrane water treatment plant to treat water from the C.C. Cragin Reservoir

  • Assisted with site selection, membrane equipment selection, piloting of the equipment and preliminary and final design

  • Added pre-treatment regimen to mitigate the creation of disinfection-by-products within the treated water, which included the addition of PACI and post-treatment with granular activated carbon within the treatment train

  • Also designed 500,000 gallon, 310,000 gallon, and 240,000 gallon tanks